- City of Delray Lindell Boulevard/SW 10th Avenue Roadway Improvements Project
Your Logo

City of Delray Beach Lindell Boulevard/SW 10th Avenue Roadway Improvements Project

City of Delray Beach Lindell Boulevard/SW 10th Avenue Roadway Improvements Project

City Project Number: 17-074

ITBC No.: 2023-068

FDOT LAP Project Number: 441533-1-58-01

Federal Aid Project ID: D422-087B

FDOT LAP Contract: G2I13

Project Limits: SW 10th Ave. from Linton Blvd. to Lindell Blvd. and Lindell Blvd. from SW 10th Ave. to Dixie Hwy.

Start Date: June 3, 2024

Completion Date: Summer 2026

Estimated Construction Cost: $10 million

Project Funding:  The City of Delray Beach was awarded a federally ­funded grant by the Transportation Planning Agency of Palm Beach County (TPA) under its Local Initiatives Program to improve Lindell Boulevard/SW 10th Avenue from Linton Boulevard to Lindell Boulevard and Lindell Boulevard from SW 10th Avenue to west of FEC crossing at Dixie Highway with a focus on (Americans with Disabilities Act) ADA pedestrian improvements, bicycle facilities accommodation and complete streets.

Scope of Work:

Project improvements include roadway widening and reconstruction, milling and resurfacing, drainage improvements, constructing a ten-foot shared-use path on the west side of the roadway and a 6-foot sidewalk on the east side, driveway reconstruction, installation of speed tables, bus shelters and pads, replacing guardrail and installing lighting infrastructure along the newly constructed sidewalks.

The current roadway consists of two 11’ travel lanes with a swale on either side. 6’ sidewalks run intermittently along the corridor, with little connectivity throughout the project limits. The project is a Complete Streets project and is intended to improve environment for all road users, including motorists, cyclists, pedestrians, and individuals with disabilities.

Point of Contact:

Delray Hotline: 561-285-1740

Email: projectdelray@gmail.com

Documents:

IMPORTANT UPCOMING CLOSURES AND DETOURS affecting Lindell Blvd on NOVEMBER 3-7, 2025 & NOVEMBER 10-14, 2025, see notices below.

PDF IconSpeed Table 1 Reconstruction Lindell Blvd Closure for 11-3-2025

PDF IconSpeed Table Reconstruction Lindell Blvd Closure for 11-10-2025


Lindell Blvd – September 2025

Lighting Conduit Installation

Sidewalk Construction

Lindell Blvd – August 2025

Fire Hydrant Relocation

Sidewalk Installation

Lindell Blvd – July 2025

Valley Gutter Installation

Sidewalk Placement

Lindell Blvd – June 2025

French Drain Pipe Intallation

Sidewalk Installation

Lindell Blvd – May 2025

Sidewalk Construction

Curb Construction

Drainage Structure Installation

Sidewalk Concrete Placement

Lindell Blvd – March 2025

Drainage Installation

Trenching Electrical Conduit

Lindell Blvd – February 2025

French Drain installation

Sidewalk Preparation

Lindell Blvd – January 2025

Lindell Sidewalk Construction

Lindell Curb Construction


Lindell Blvd – December 2024

Lindell Drainage Work

Lindell Trench Compaction

Lindell Blvd – November 2024

Curb Construction

New Sidewalk Construction

Bus Pad Construction

Lindell Blvd – October 2024

Sidewalk Construction>

Bus Pad Construction

Lindell Blvd – September 2024

New Sidewalks and Curbs

New Raised Curb Construction

Lindell Blvd – August 2024

Drainage Construction

Lighting Conduit installation

Sidewalk Construction

Lindell Blvd – July 2024

Clearing & Grubing, Tree Removal

Drainage Construction

French Drain Construction

Lindell Blvd – June 2024

Clearing & Grubing Proposed Sidewalk

Grading & Compacting Proposed Sidewalk

Embankment Backfill & Compaction Proposed Sidewalk

Project Map

Project Photos

Pre-Construction

Lindell facing 10th 20230711_161148 20230711_154143 May 2025 Sidewalk Construction
May 2025 Curb Construction